Client / client: Bau- und Liegenschaftsbetrieb NRW, Duisburg Realization: 2006 Process: Competition.
Urban improvement: The new creating complements the historical monastery ensemble and thus clearly relates towards the listed context. The style has the cour d? Honneur in its geometry by finishing the edge from the square provided by the administration wing and help me write my thesis continuing it as a room delimitation inside. The courtyard is hence the guiding principle for the constructing design and style without the need of restricting the independent architectural and design and style language. At the similar time, the alignment from the constructing edges around the courtyard level enables the view to the adjoining open http://www.pace.edu/dyson/departments/publishing/graduate-certificate-programs space amongst the auditorium and the cafeteria. By layering the structure, the design and style reacts for the urban limits of the monastery complicated, orientates the library towards the residence and thus clearly assigns the new developing for the historical ensemble. The value with the library is emphasized by the cantilevered upper floor. The generous glazing of the reading space, the “window to the courtyard”, corresponds using the other buildings. A gate circumstance is designed in between the library and the administration wing, which leads from the square in front of the cafeteria www.thesiswritingservice.com/help-writing-a-research-paper-thesis/ towards the cour d? Honneur. The new constructing closes the edge in the courtyard to Klemensborn along with the space in front on the cafeteria is specified.
Developing idea: The developing is entered from the cour d? Honneur and is divided into three floors. The courtyard along with the upper floor type the building that is definitely perceptible in the cour d? Honneur. Right here, intermediate levels and galleries are inserted in sub-areas, which divide the volume with the main floors into zones of different spatial effects and high quality of encounter. The overlapping geometries of your ceilings make fascinating visual relationships. University and library use are accessed separately and can therefore be operated independently of 1 a further: The seminar rooms around the basement floor plus the professors’ offices on the gallery level of the courtyard floor are connected by means of a separate staircase. Access towards the library with reception, distribution counter and media location is on the courtyard level. Additional central functions are arranged there on a gallery and are connected by means of the spacious staircase.
Material: The facade with the library is intended as a directional cladding produced of metal. Extra components for instance the street-side wall with the basement and also the frame on the building access are planned in natural stone. Subordinate room closures are made of glass of distinctive transparency. Set bodies which include the elevator and the archive are highlighted by contrasting wood coverings.
Outdoor facilities: The cour d? Honneur square will likely be restored to its original size. The historical paving are going to be supplemented and the topography with the constructing access will probably be adapted for the specifications. In contrast, the adjacent open space amongst the auditorium as well as the cafeteria is greened. In this way, the differentiated identities from the diverse courtyard areas on the monastery are worked out and strengthened. The wall adjacent towards the gate constructing are going to be closed, thereby strengthening the significance in the gate building.
WBW new constructing library Folkwang Monday, September 25, 2006 Dorothee Egger.